Facebook Twitter In YouTube Google+ Blog
Home | Miron Experience | Join the Team | Search Form

Whelan Energy Center Unit 2 Superstructures

Hastings, NE


click left and right arrows above to see more project images and/or videos



Owner: Public Power Generation Agency
Architect / Engineer: Black & Veatch

Project Description:

Whelan Energy Center is located six miles outside of Hastings, Nebraska. Construction for this project consisted of a new 220 MW coal-fired electric generating unit. Miron executed the Superstructures contract as part of a multiple prime project delivery method. Miron’s scope of work included:

  • Approximately 5,000 CY of suspended slabs-on-metal deck and finish slab-on-grade
  • All CMU masonry.
  • HVAC and control for control room, turbine area, boiler area, and ancillary structures.
  • Roofing and insulated metal siding for the turbine area, boiler area, AQCS, and ancillary structures.
  • Miscellaneous foundation installations.
  • Furnish and installation of miscellaneous steel.
  • Fireproofing.
  • Hollow metal and overhead doors and hardware.
  • Interior build-outs throughout the plant (i.e., plumbing, metal studs/drywall, shaft wall, finishes, specialties).
  • Installation of Owner-furnished auxiliary hoists and cranes.