Alliant Energy Kilbourn Dam

Wisconsin Dells, WI


click left and right arrows above to see more project images and/or videos



Owner: Alliant Energy

Project Description:

Miron manufactured and installed 36 trash racks for this hydroelectric plant. Our scope included using a dive team to clean debris from the lower face of the racks and clean out the lower keyslot to ensure the racks would seat properly in the base on the dam. Racks were removed and replaced one at a time to ensure no debris could flow through and damage the intake on the turbine. Using a Miron-owned crane, our team rigged and removed, picked and set the new racks into position quickly and efficiently.