Facebook Twitter In YouTube Google+ Blog
Home | Miron Experience | Join the Team | Search Form

Dane County Regional Airport Parking Structure Expansion

Madison, WI


click left and right arrows above to see more project images and/or videos



Owner: Wisconsin Department of Transportation
Size: 469,155 SF addition / 1,072,387 SF remodel
Completion: October 2015
Architect / Engineer: GRAEF

Additional Resources:

Project Description:

Dane County Regional Airport serves more than 1.6 million travelers per year, and annual passenger increases of 4 to 6 percent a year (well above the national average) have led to a shortage of covered parking and prompted this vertical expansion. Existing demand was already greater than the supply of the ramp, and studies forecast a need for additional spaces over the next 10 years.

This project added three floors onto the existing parking ramp adjacent to the terminal, increasing the amount of spaces by 1,500. The project also included restoration of the existing 3,200 parking stalls in the existing ramps. Pre-cast construction ensured a proper match of the architectural design of the current parking ramp. Site improvements were also included.