Coldwater Public Utilities - CHP Peaking Plant

Coldwater, MI


click left and right arrows above to see more project images and/or videos



Owner: Coldwater Board of Public Utilities, Michigan South Central Power Agency
Completion: August 2015
Architect / Engineer: Baisch Engineering, Inc.

Project Description:

This project consisted of the construction of a natural gas powered CHP peaking facility utilizing reciprocal engine/generator technology. Project scope included:

  • Greenfield site construction
  • Installation of (3) 624 GE engine/generator sets
  • All site work and tie-in to existing power and water services
  • Site development/earthwork
  • Engine/office building
  • CodiNOX modules
  • 14 MW engine generator capacity
  • All above- and below-grade mechanical piping and ancillary equipment
  • All electrical, control, and instrumentation