Facebook Twitter In YouTube Google+ Blog
Home | Miron Experience | Join the Team | Search Form

Bayport High School Additions & Renovations

Suamico, WI


click left and right arrows above to see more project images and/or videos



Owner: Howard-Suamico School District
Size: 10,035 SF
Completion: August 2015
Architect / Engineer: Armstrong Torseth Skold & Rydeen Inc.

Project Description:

The project consisted of three separate additions to the main building including construction of a music room, commons area, and storage room. A secured entry was created as part of the district-wide door and lock security upgrades.

The music room addition increased instructional space by creating an orchestra rehearsal room to meet the demands of the rapidly growing program. Gymnasium space was augmented by the addition of a storage room.

The common spaces were enlarged for student gatherings by an addition to the existing cafeteria.