Facebook Twitter In YouTube Google+ Blog
Home | Miron Experience | Join the Team | Search Form

Shawano Community Middle School Remodel

Shawano, WI


click left and right arrows above to see more project images and/or videos



Owner: Shawano School District
Size: 135,600 SF
Completion: August 2016
Architect / Engineer: Somerville Architects & Engineers

Project Description:

The biggest component to this middle school makeover was the replacement and upgrade of the heating, ventilating and air conditioning system and controls throughout the entire building, much of which was original to the 1954 construction.

Additionally, security enhancements were needed to better control access into the building for school and community use; the existing entrance was modified to provide a secure point of entry and improve traffic flow. The front offices were remodeled and reconfigured.

The commons area was expanded, the kitchen upgraded, the band and orchestra/choir rooms reconfigured to better facilitate instruction, the gymnasiums refreshed, and locker rooms modernized. ADA requirements and code compliance were also addressed.



Testimonial:
“No matter the size of the project, Miron makes us feel like ours is the most important. They’re always there for us, making things run smoothly with extensive pre-planning and efficient processes, creative problem solving, and friendly reassurance. They just make it happen. That’s why we’ve had a successful relationship with Miron for more than 20 years.”

- Gary Cumberland, District Administrator