Facebook Twitter In YouTube Google+ Blog
Home | Miron Experience | Join the Team | Search Form

Baldor Plant Addition

Oshkosh, WI


click left and right arrows above to see more project images and/or videos



Owner: Baldor Electric Company
Size: 132,000 SF
Completion: March 2007
Architect / Engineer: Excel Engineering Inc.

Project Description:

Baldor Electric Company, international designers and manufacturers of industrial electric motors, drives, and generators, more than doubled their Oshkosh generator manufacturing plant with a 132,000 square-foot addition. The project was designed and constructed to Factory Mutual Global standards. The plant includes R&D facilities, multiple test bays for generators up to 2 megawatts, four bridge cranes, superflat floor slabs, 150 HP electric fire pump, interior tempered truck docks, and exterior storage facilities. Miron was responsible for sub/superstructure, steel erection, and miscellaneous equipment installations.