Facebook Twitter In YouTube Google+ Blog
Home | Miron Experience | Join the Team | Search Form

Oconto Falls Tissues - #2 PM Installation

Oconto Falls, WI




Owner: Oconto Falls Tissue Inc.
Completion: July 2000

Project Description:

Miron was responsible for installation of a new paper machine, stock preparation equipment, and other building modifications. Specifically, Miron set and aligned all equipment for the stock preparation system including a DAF, washers, screens, cleaners, and miscellaneous pumps and other equipment. In addition, Miron set and aligned the paper machine sole plate, wire section, felt section, and installed the winder on the dry end of the machine. The 12’ diameter Yankee was delivered to the job site. Miron was responsible for off loading and setting the Yankee on the machine.