Project Overview
This project consists of the construction of a new 50.1 MW dual fuel reciprocating internal combustion engine plant utilizing three (3) Wartsila 18/50DF units and ancillary equipment. The project scope included:
- Brownfield site construction
- All earthwork, paving, fencing, underground piping, and conduit/duct bank
- Reinforced concrete foundations, structural steel erection, siding, and architectural finishes
- Equipment installation
- Process piping, insulation and lagging, fire protection, HVAC, and plumbing
- Electrical, instrumentation, and control
- Substation interconnection