Project Overview

The existing 170,145 SF recreational center will be demolished and replaced on the same site with a 240,560 SF building. A skywalk will be used to keep the new center connected to nearby LaBahn Arena.

The new recreational center will help the school meet increasing student demand. It will feature eight basketball courts (twice as many as are found in the existing building), 30,400 SF of fitness space, five fitness studios, nearly 30 short-course pool lanes, a diving well, and seating for 1,200 spectators.

Education Market Leader

Craig Uhlenbrauck / Vice President, Education, Education
920.969.7030
craig.uhlenbrauck@miron-construction.com

Owner:

State of Wisconsin

Size:

240,000

Completion:

December 2020

Architect / Engineer:

Workshop Architects, Inc.