Fort panel approves site plan for addition to Redi-Serve
Posted on Jan 23, 2014
by Industrial
As Redi-Serve Foods marks its 45th year in Fort Atkinson, the city’s Planning Commission approved the site plan Tuesday for a 13,000-square-foot addition to the food processor’s plant at 1200 Industrial Drive.
The proposed project includes loading docks, a cooler addition and a mechanical room to support the existing frozen foods production line. Cost estimates for the project were not revealed.
Redi-Serve is working with Excel Engineering Inc. of Fond du Lac for architect and engineer services and Miron Construction of Neenah as the general contractor.
Leave a Reply
You must be logged in to post a comment.