Miron Construction to build Wisconsin’s largest biodigester

Posted on Sep 30, 2020 by miron_admin

B.C. Organics LLC is planning to build Wisconsin’s largest biodigester in Wrightstown. The biodigester will collect 900,000 gallons of manure produced by 29,000 cows from 13 local farms and convert it into natural gas (methane). Dynamic Concepts has been chosen as the architect, McMahon Group as the engineer and Miron Construction Co. as the general contractor. The project is valued at $60 million. Read more … 

Leave a Reply