Miron installs pedestrian bridge on Wausau riverfront
Posted on Dec 14, 2016
by Community
WATCH as Miron Construction crews install an 80-foot pedestrian bridge Tuesday as part of Wausau’s riverfront development project. Despite below-zero temperatures, they took less than an hour to prep and have it lifted onto its constructed foundation.
Leave a Reply
You must be logged in to post a comment.