Miron Construction begins work on Racine Lift Station project
Posted on Aug 30, 2018
by Construction
Miron Construction Co., Inc., in partnership with engineering firm Brown and Caldwell, recently began work on the Racine Lift Station project for Racine Water and Wastewater Utilities. The project began in June 2018 and is scheduled to be complete in July 2019.
Miron’s scope of work on the $9.7 million project includes the installation of a 2.4-million-gallon below-grade cast-in-place concrete storage basin as well as a diversion structure and new sewer structures.
Leave a Reply
You must be logged in to post a comment.