Miron Construction to build new swimming pool for City of Merrill
Miron Construction Co., Inc. is partnering with Water Technology Inc. (WTI) to build a new swimming pool for the City of Merrill in Merrill, Wis.
Construction started in May and is scheduled to be complete in May of 2016.The pool will be 7,400 square feet, accompanied by a 2,300-square-foot changing facility and a 1,520-square-foot equipment and concession building. The development will be located in the Merrill Area Recreation Complex (MARC) Park on Marc Drive. The pool is cast-in-place concrete, and the buildings are concrete foundations and reinforced masonry wall construction with an asphalt shingle-covered wood truss roof. The city’s old swimming pool, which was in great need of repair, was open from 1968 to 2012.
For more information on Miron’s experience working on community/recreation projects, such as Shattuck Park Pavilion and Riverwalk in Neenah, Wis. or Apple Creek Nature Preserve & YMCA in Appleton, Wis., visit https://miron-construction.com/projects/category/Governmental/Community.
Leave a Reply
You must be logged in to post a comment.