Project Overview
Agropur’s waste water treatment plant was completed in conjunction with the dryer renovations, warehouse addition, and cheese plant expansion.
This project included:
-
Site work including new retention pond
-
Constructed new cast-in-place concrete anaerobic selector basin, EQ/AC tanks, and control building
-
Installed new sludge press
-
Modified existing structure to act as the new final clarifier
-
Installed a new final aeration basin
-
Installed foundations for the new micro-turbines and setting of micro-turbines
-
Installed all underground process waste piping