Project Overview

Agropur’s waste water treatment plant was completed in conjunction with the dryer renovations, warehouse addition, and cheese plant expansion.

This project included:

  • Site work including new retention pond
  • Constructed new cast-in-place concrete anaerobic selector basin, EQ/AC tanks, and control building
  • Installed new sludge press
  • Modified existing structure to act as the new final clarifier
  • Installed a new final aeration basin
  • Installed foundations for the new micro-turbines and setting of micro-turbines
  • Installed all underground process waste piping

Environmental Market Leader

Jason Rieth / Vice President, Energy & Environmental, Environmental
715.841.4029
[email protected]

Owner:

Agropur Inc. (Trega Foods)

Completion:

December 2013

Architect / Engineer:

Symbiont