Project Overview

The project additions include:

  • New 800-seat auditorium with full orchestra pit, full fly, and lighting catwalk
  • Lobby with pre-function space and restrooms
  • Set construction area, storage spaces, and dressing rooms
  • New band, choir, and music classrooms
  • Secure entry vestibule

Renovation work includes:

  • HVAC improvements; new ceilings, flooring, and doors; safety, electrical, and plumbing upgrades for administrative offices, library, large group instruction, and science lab classrooms
  • Fire alarm replacement
  • Relocation of the weight/fitness room to the remodeled/expanded music area.
  • Remodel/expansion of STEM and FACE areas including woods, metals, electronics, and home economics labs into existing weight/fitness spaces

The scope also includes construction of a stand-alone building to serve existing athletic fields with restrooms, concessions, ticketing, team room, and storage.

Education Market Leader

Craig Uhlenbrauck / Vice President, Education, Education
920.969.7030
[email protected]

Owner:

Slinger School District

Size:

42,000 SF addition | 70,000 SF renovation | 6,500 SF new (outdoor concessions building)

Completion:

August 2018

Architect / Engineer:

Bray Associates Architects, Inc.

In their words…

"We were thrilled by our entire Miron experience. All three phases of our project were completed on time and under budget despite having numerous unexpected surprises within our buildings that drove up costs and slowed down the building process."
- Daren Sievers, District Administrator