Project Overview

This project consisted of the construction of a natural gas powered CHP peaking facility utilizing reciprocal engine/generator technology. Project scope included:

  • Greenfield site construction
  • Installation of (3) 624 GE engine/generator sets
  • All site work and tie-in to existing power and water services
  • Site development/earthwork
  • Engine/office building
  • CodiNOX modules
  • 14 MW engine generator capacity
  • All above- and below-grade mechanical piping and ancillary equipment
  • All electrical, control, and instrumentation

Energy Market Leader

Jason Rieth / Vice President, Energy & Environmental, Energy
715.841.4029
[email protected]

Owner:

Coldwater Board of Public Utilities, Michigan South Central Power Agency

Completion:

August 2015

Architect / Engineer:

Baisch Engineering, Inc.

Share:

Contact Us Today Regarding Your Next Project