Project Overview

The project consists of a 40,000 square-foot, new material packaging and corporate office addition at the existing Galloway Company facility. The general scope of work for the project consists of:

  • Site Work – excavation of a 10,000 square-foot full basement, rework of an existing roadway, loading dock asphalt and concrete paving, site utility abandonment, new storm sewer as well as potential demolition of current residential dwellings
  • Building Structure – concrete foundations, floor slabs, precast wall panels and plank, masonry walls, structural steel, joist and metal deck, fully adhered and metal roofing system, coiling and overhead doors and aluminum curtain wall and windows
  • Finishes – carpet, resilient, rubber, and fluid-applied flooring, acoustical ceilings and painting
  • Elevator and loading dock equipment
  • Plumbing process systems
  • New fire protection, HVAC, and electrical systems

Food Processing Market Leader

Daniel Voss / Vice President, Food & Beverage, Food Processing
920.969.7062
daniel.voss@miron-construction.com

Owner:

Galloway Company

Size:

40,000 SF

Completion:

April 2014