Project Overview

This project included a new dryer, baghouse, powder silos, and warehouse addition to support expanded cheese production operations, as well as the replacement of an existing dryer. Building construction utilized a combination of both steel and precast framing, precast floors, and both precast and IMP walls. The project team developed a detailed phasing plan in order to construct the building in between two existing buildings. The collaborative pre-planning effort ensured the plant maintained operations at both buildings during construction. Work included the construction of temporary walls inside the existing facility in order to facilitate a new stair tower, utility tie-ins, and structural modifications

Dairy Market Leader

Logan Krueger / Vice President, Food & Beverage, Dairy
920.886.7853
[email protected]

Owner:

Confidential

Size:

46,500 SF

Completion:

April 2020

Architect / Engineer:

McMahon